Concreting in the Wet Season — How to Schedule Around the Weather Without Losing Money

Concreting in Queensland's wet season is a margin killer. Learn how to quote, schedule, and prep for weather delays so a rained-out pour doesn't take your bottom line with it.

Category: Operations | Read time: 6 min read


There's a particular kind of frustration that only concreters understand — you've got the formwork up, the steel's tied, the pump's booked, and then you check the BOM radar at 5am and there's a dark green blob the size of Queensland sitting right over your site. The pour's off, but the pump still charges a cancellation fee, the labour's already rostered, and the client's messaging to ask if you're still coming. Welcome to concreting in the wet season — where the difference between a good year and a bad one isn't how well you pour, it's how well you plan around the days you can't.

Ask any concreter who's been at it through a few Brisbane summers and they'll tell you the same thing: most blokes have a weather strategy that boils down to "check the radar and hope." That works about as well as you'd expect — which is to say, it works right up until it doesn't, and when it doesn't the costs cascade through the rest of the week. Here's what the ones who stay profitable through the wet months do differently.

The Real Cost of a Washed-Out Pour

The obvious cost is the pump cancellation fee — anywhere from $300 to $800 depending on the setup, and some pump companies charge full rate if you cancel inside 24 hours. But that's the small stuff. The bigger hits are the ones that don't show up on a single invoice.

Your crew is rostered and either you send them home (and they still expect to be paid, as they should) or you scramble to find fill-in work that rarely exists. The concrete order is cancelled but the batching plant has already allocated your slot, and do that twice in a month and suddenly you're not their favourite customer anymore — which matters when you need thirty cubes on short notice in November. The formwork sits there getting rained on, and timber that's been wet for three days warps enough that your edges aren't straight when the pour finally happens. And the client, who only sees that the job was supposed to be done Tuesday and it's now Friday, doesn't care about the weather radar — they care that their driveway isn't finished.

Add it up across a Brisbane summer and a concreter who doesn't plan for weather delays is losing somewhere between five and fifteen thousand dollars a season. Not in one dramatic hit — in a hundred small ones.

Build a Wet-Season Buffer Into Every Quote

The single most effective thing you can do is stop quoting concreting jobs as though every day is a dry day. Quote them as though one in four days between December and March is going to be a write-off, because in South East Queensland that's roughly what you're dealing with.

That doesn't mean adding a "weather surcharge" line to every quote — nobody wants to see that, and it's the quickest way to lose a residential job to the bloke who's quoting like it's always sunny. It means building the buffer into your rate. If your real day rate is $95 an hour, price wet-season jobs at $105. That extra ten bucks across the job covers the pump cancellation when it happens, the half-day you pay the boys to sweep the shed instead of pour, and the formwork timber you had to replace because it sat in the rain for a week.

Clients don't see it and you don't have to explain it. It's just your price.

The Three-Day Rule

Here's a scheduling approach the most reliable concreters swear by, and it's embarrassingly simple: never schedule a pour as the last thing in your week.

Friday pours are the enemy. If it gets rained out, the job sits all weekend — formwork full of water, client stewing, and you can't do anything about it until Monday. By then the steel's got surface rust, the excavation's got an extra inch of mud in the bottom, and the whole prep job needs rework before you can pour. Schedule your pours for Tuesday through Thursday. If Tuesday washes out, you've got Wednesday and Thursday to recover. If Thursday washes out, Friday's a prep day for next week and nothing's lost.

The other half of this is the concrete order itself. Most concreters order the day before for an early morning pour. In the wet season, talk to your batching plant about a provisional booking — you book the slot but confirm by 6am on the day. Some plants won't do it unless you're a regular, but most will if you're straight with them about why. The ones that won't are the ones you'll leave for a competitor anyway.

What to Tell the Client (Before They Ask)

The worst time to explain weather delays to a client is after the pour's been cancelled. By then they're already annoyed and anything you say sounds like an excuse. The best time is when you hand over the quote.

The concreters who stay out of arguments put two lines in every wet-season quote, and it's stopped more disputes than a ten-page contract would. It goes something like: "Concrete pours require dry conditions. Wet-season jobs may be rescheduled at short notice — any day lost to weather will be made up within three working days. Pump cancellation fees, if incurred, are not passed on to the client."

That last bit — about not passing on pump fees — is important. Yes, you're absorbing the cost. But you've already built it into your rate, and telling a client they won't get a surprise bill for a cancelled pump is the fastest way to make them okay with the delay. They hear "won't cost you extra" and they stop worrying about when.

Site Prep That Survives the Rain

If you know a pour might sit for a few days, prep the site differently. Cover your formwork with plastic at the end of each day — the cheap black poly from Bunnings works fine, and five minutes of covering beats two hours of re-levelling. Slope your excavation slightly so water drains to one side rather than pooling across the whole pad. If you're doing exposed aggregate, accept that you might need to re-expose the surface after heavy rain and price that possibility in.

And for the love of everything, don't leave cement bags on site overnight in February. You'd think this goes without saying, but every wet season someone's twenty bags of off-white turn into a single solid block because they couldn't be bothered throwing a tarp over it.

Know When to Call It

The hardest decision in concreting isn't technical — it's knowing when to pull the pin on a pour that's borderline. The radar says the storm might miss you. The client's been waiting two weeks. You've got the crew standing there. Everything in you wants to go for it.

Here's the rule experienced concreters run by: if there's more than a 40% chance of rain during your pour window, you cancel. Not because you can't pour in a light shower — you can, and plenty of good slabs have been finished in drizzle. But because the risk of a proper downpour hitting mid-pour is too high, and the cost of half-finishing a slab that then gets hammered by rain is ten times the cost of rescheduling. A cancelled pour costs you a day. A rain-damaged slab costs you the whole job and possibly the client.

The radar lies often enough that 40% is about the right line. Below that, go. Above it, call it. Your gut will tell you to push it. Your gut's been wrong before.

Wet Season Tool and Plant Maintenance

Rain days aren't dead days — they're maintenance days you've been putting off since spring. Service the power trowel. Sharpen the edging tools. Check the vibrator's still running smooth. Replace the screed rails that have been slightly bent since that job in March where the subbie backed his ute into the stack. Clean the concrete off everything — and I mean everything. The shovels, the wheelbarrows, the bucket on the excavator that's had half an inch of set concrete on it since Christmas.

Rain days are also admin days. Update your materials pricing from the supplier's latest catalogue — concrete prices move more than most tradies realise, especially when cement shortages hit, and quoting off last year's rates is how you lose margin on every pour. Send the quotes you've been sitting on. Chase the invoices that are over thirty days. Do the BAS that's due next week. A rain day spent on admin is a rain day that's earning its keep.

The Bottom Line

Concreting in the wet season isn't about avoiding the weather — you can't. It's about building a system where the weather doesn't dictate your profitability. Price the buffer in. Pour Tuesday to Thursday. Tell the client the rules before they become the client's complaint. Prep the site like it might sit for three days, because it might. And when the radar's dark green at 5am, call it early — because the only thing worse than losing a day's pour is explaining to a client why their new slab looks like the surface of the moon.


Trade Track helps Australian tradies manage quotes, jobs, and invoices so you spend less time on paperwork and more time on the tools. No credit card required · 7-day free trial.

Ready to run your trade business smarter?

Trade Track helps Australian tradies manage quotes, jobs, and invoices from one simple platform — so you spend less time on admin and more time on the tools.

Start Free Trial →

No credit card required · 7-day free trial

← Back to Blog